MARGÜN ENERJİ ÜRETİM SANAYİ VE TİCARET A.Ş.
Açıklama
Jeotermal Enerji Santrali Alımı Tescili Hk.
KAP Metninden Alıntı
Yapılan Açıklama Güncelleme mi? Yapılan Açıklama Düzeltme mi? Yapılan Açıklama Ertelenmiş Bir Açıklama mı? Alıma İlişkin Yönetim Kurulu Kararında Bağımsız Üyelerin Çoğunluğunun Onayı Var mı? Did Takeover Bid Obligation Arised? Will Exemption Application be Made, if Takeover Bid Obligation Arised? Karşı Taraf SPK Düzenlemelerine Göre İlişkili Taraf mıdır? Is Counter Party a Related Party According to CMB Regulations? Değerleme Raporu Düzenlendi mi? Did Valuation Report be Prepared? Net Kurumsal Gayrimenkul Değerleme ve Danışmanlık A.Ş. Bu satın almanın toplam bedeli 105.500.000 USD - Yüz Beş Milyon Beş Yüz Bin Amerikan Doları (5.085.891.250,00 TL – Beş Milyar Seksen Beş Milyon Sekiz Yüz Doksan Bir Bin İki Yüz Elli Türk Lirası) olup, ödemeler tamamlanarak 03.09.2026 itibarıyla hisse devri gerçekleşmişti. Söz konusu hisse devri, 8 Eylül 2026 tarihinde tescil edilerek, 8 Eylül 2026 tarih ve 11661 sayılı Ticaret Sicil Gazetesi'nde ilan edilmiştir. İlgili sözleşme kapsamında 3 adet ruhsat sahasının (Denizli Sarayköy, Denizli Buldan ve Manisa Alaşehir) da devri gerçekleşecektir. Aydın ili Germencik ilçesinde faaliyet gösteren ve toplam 24,00 MWm kurulu güce sahip olan satışa konu jeotermal enerji santrali, Kasım 2024 tarihinde işletmeye alınmıştır. Santralde üretilen elektrik enerjisi, 5346 sayılı Yenilenebilir Enerji Kanunu (YEKDEM) kapsamında 15 yıl boyunca devlet alım garantisi altında olup; ilk 5 yıl yerli aksam katkı payı dahil yaklaşık 12,50 USD cent/kWh, kalan 10 yıl ise yaklaşık 10,50 USD cent/kWh fiyat üzerinden satışa konu olacaktır. Söz konusu santralden yıllık yaklaşık brüt 200.569.000 kWh elektrik üretimi beklenmektedir. Potansiyel ek gelirler hariç olmak üzere sadece elektrik üretiminden, ilk 5 yıl yerli katkı ilavesi dâhil yıllık yaklaşık 16.446.655 USD (792.852.121 TL) satış geliri ile yaklaşık 13.462.073 USD (648.972.884 TL) FAVÖK öngörülmektedir. İlk 5 yıllık sürenin sona ermesini takiben ise, söz konusu santrallerden sadece elektrik üretiminden yıllık toplam yaklaşık 14.802.000 USD (713.567.415 TL) satış geliri ile yaklaşık 11.724.000 USD (565.184.730 TL) FAVÖK beklenmektedir. YEKDEM süresi boyunca ise potansiyel ek gelirler hariç olmak üzere sadece elektrik üretiminden toplam yaklaşık 215.451.275 USD (10.386.367.340 TL) satış geliri ile yaklaşık 172.826.365 USD (8.331.526.991 TL) FAVÖK öngörülmektedir. Şirketimiz, 2025 yılında 12 MWm kurulu güce sahip jeotermal enerji santralinin satın alınmasıyla birlikte toplam kurulu gücünü 130,03 MWm'ye yükseltmiş, işbu 24 MWm kurulu güce sahip HEZ MORALI JES-1 elektrik üretim santralinin satın alınmasıyla Şirketimizin toplam kurulu gücü 154,03 MWm'ye ulaşmıştır. Şirketimiz ayrıca 4 hidroelektrik, 5 rüzgar, 1 jeotermal ve 3 güneş toplam 200,04 MWm elektrik üretim santrali bulunan iştiraklerimiz ile birlikte toplam kurulu gücümüz 354,07 MWm'ye ulaşmıştır. İlgili santralin kurulu ve üretimde bulunduğu Aydın Söke-Germencik'te 9.054,92 hektarlık alanı kapsayan jeotermal işletme ruhsatlı sahaya ilişkin gerekli teknik çalışmalar 08.06.2026 tarihinde tarafımıza iletilmiş, mevcut çalışan santralin genişleme yatırımları kapsamında öngörülen kapasite artışları dikkate alınarak yatırımı tamamlanmış 100 MWe kapasitede bir şalt sahası ve trafo merkezi daha önceden kurulmuştur. Bu kapsamda, ilerleyen dönemlerde ilave 72 MWm jeotermal elektrik santrali yapımı sonrasında bağlantı için gerekli altyapı hazır olup, ilgili yatırımların önümüzdeki dönemde gerçekleştirilmesi planlanmaktadır. Söz konusu ilave yatırımın tamamlanmasıyla birlikte, ilgili jeotermal işletme ruhsatlı sahada yapılacak yeni yatırımlar sonucunda toplam 96 MWm kurulu güce sahip jeotermal elektrik santralinin işletmede olması planlanmaktadır. İlgili yatırımların tamamlanması durumunda, toplam kurulu gücü 96 MWm'ye ulaşacak jeotermal elektrik santrallerinde üretilecek elektrik enerjisi, 5346 sayılı Yenilenebilir Enerji Kanunu (YEKDEM) kapsamında 15 yıl boyunca devlet alım garantisi altında olacak olup; ilk 5 yıl boyunca yerli aksam katkı payı dâhil yaklaşık 12,50 USD cent/kWh, kalan 10 yıl boyunca ise yaklaşık 10,50 USD cent/kWh fiyat üzerinden satışa konu olacaktır. Söz konusu santrallerden yıllık yaklaşık brüt 802.276.000 kWh elektrik üretimi beklenmektedir. Potansiyel ek gelirler hariç olmak üzere yalnızca elektrik üretiminden, ilk 5 yıl boyunca yerli katkı ilavesi dâhil yıllık yaklaşık 65.786.620 USD satış geliri ve yaklaşık 53.848.292 USD FAVÖK öngörülmektedir. 18.03.2026 tarihinde imzalanan Hisse Devir Sözleşmesi kapsamında devir alınma süreci devam eden 3 adet jeotermal ruhsat sahasının (Denizli Sarayköy, Denizli Buldan ve Manisa Alaşehir) da devri gerçekleşeceği duyurulmuş olup, ilgili sözleşme kapsamında devri gerçekleşecek jeotermal ruhsatlı sahalara ilişkin gerekli teknik çalışmalar çalışmalar 08.06.2026 tarihinde tarafımıza iletilmiş, teknik çalışmalar kapsamında toplam 144 MWm kapasiteli jeotermal elektrik santrali yapımı planlanmaktadır. 144 MWm kurulu güce sahip olacak jeotermal enerji santrallerinde üretilecek elektrik enerjisi, 5346 sayılı Yenilenebilir Enerji Kanunu (YEKDEM) kapsamında 15 yıl boyunca devlet alım garantisi altında olup; ilk 5 yıl yerli aksam katkı payı dahil yaklaşık 12,50 USD cent/kWh, kalan 10 yıl ise yaklaşık 10,50 USD cent/kWh fiyat üzerinden satışa konu olacaktır. Söz konusu santralden yıllık yaklaşık brüt 1.203.414.000 kWh elektrik üretimi beklenmektedir. Potansiyel ek gelirler hariç olmak üzere sadece elektrik üretiminden, ilk 5 yıl yerli katkı ilavesi dâhil yıllık yaklaşık 98.679.930 USD satış geliri ile yaklaşık 80.772.438 USD FAVÖK öngörülmektedir. Şirketimizin 08.06.2026 tarihli KAP açıklamasında da duyurulduğu üzere; yenilenebilir enerji alanındaki yatırımlarını artırma hedefi doğrultusunda, Denizli ve Manisa illerinde yer alan toplam kurulu güç potansiyeli 505 MWm olan 9 adet Jeotermal Kaynak Ruhsatının devralınmasına ilişkin olarak, sözleşme imzalanmış devirleri 22.04.2026 tarihinde tamamlanmıştı. Ruhsat sahalarında gerçekleştirilecek farklı derinliklerdeki üretim ve enjeksiyon kuyuları sondaj faaliyetleri kapsamında; değişik kapasitelerde sondaj kulesi ve personeli temini ile servis hizmetleri ve sarf malzemelerinin sağlanmasına yönelik olarak Türkiye'de yerleşik bir şirket ile 5+5 toplam 10 adet sondaj yapılması için sondaj kulesi hizmet sözleşmesi imzalanmıştır. Bu kapsamda, jeotermal projeleri yatırımlarına başlanmış olup, 20.07.2026 tarihinde açıklamış olduğumuz Jeotermal Sondaj Proje Yönetimi ve Kuyu Mühendisliği Hizmet Sözleşmesi ile Sondaj Hizmetleri Sözleşmesi işveren mühendisliği ve denetim şirketinin gözetiminde sondaj çalışmalarına başlanmıştır. Yatırımlarını tamamlaması durumunda, kabul tarihinden itibaren 5 yıl süreyle yerli katkı ilavesi dâhil ortalama 12,50 USD cent/kWh, izleyen yıllarda ise ortalama 10,50 USD cent/kWh bedel üzerinden, 5346 sayılı YEK Kanunu kapsamında toplam 15 yıl süreyle devlet alım garantisi altında elektrik satışının gerçekleştirilmesi öngörülmektedir. Jeotermal santrallerden yıllık brüt yaklaşık 3.863.250.000 kWh elektrik üretimi beklenmektedir. Potansiyel ek gelirler hariç olmak üzere sadece elektrik üretiminden, ilk 5 yıl yerli katkı ilavesi dâhil yıllık yaklaşık 462.850.000 satış geliri ile yaklaşık 370.250.000 USD FAVÖK öngörülmektedir. İlk 5 yıllık sürenin sona ermesini takiben ise, söz konusu santrallerden sadece elektrik üretiminden yıllık toplam yaklaşık 405.000.000 USD satış geliri ile yaklaşık 324.000.000 USD FAVÖK beklenmektedir. HEZ MORALI JES-1 santralinin ve ilgili ruhsat sahalarının devrinin tamamlanmasının ardından; mevcut 24 MWm kurulu güce sahip santral ile birlikte yatırımı yapılacak olan jeotermal elektrik santralleri kapasitesi 72 MWm, 144 MWm ve 505 MWm olmak üzere toplam 745 MWm kurulu güç potansiyeline ulaşılması öngörülmektedir. Söz konusu 745 MWm kurulu güce sahip jeotermal enerji yatırımlarının tamamlanması halinde yıllık yaklaşık 5.868.940.000 kWh brüt elektrik üretimi gerçekleştirilmesi beklenmektedir. Potansiyel ek gelirler hariç olmak üzere yalnızca elektrik satışlarından ilk 5 yılda yıllık yaklaşık 627.316.550 USD satış geliri ve 504.870.730 USD FAVÖK, sonraki dönemde ise yıllık yaklaşık 553.020.000 USD satış geliri ve 441.240.000 USD FAVÖK elde edilmesi öngörülmektedir. Kamuoyuna ve yatırımcılarımıza saygıyla duyurulur. Margün Enerji Üretim Sanayi ve Ticaret A.Ş., in line with its objective of increasing its investments in the renewable energy sector, had announced on May 11, 2026 that a Preliminary Protocol was signed on January 12, 2026 and a Share Transfer Agreement was signed on March 18, 2026 for the acquisition of 100% of the shares of Hez Enerji İnşaat San. ve Tic. A.Ş. ("Hez Enerji"), which was developed and established by our Company or our subsidiary Margün Jeotermal Enerji Üretim A.Ş. (the "Group") within the scope of the Electricity Market Licensing Regulation and which owns the HEZ MORALI JES-1 power generation plant with an installed capacity of 24 MWm, with all revenues and expenses attributable to the Group as of January 1, 2026. The total consideration for this acquisition was USD 105,500,000 (One Hundred Five Million Five Hundred Thousand United States Dollars) (TRY 5,085,891,250.00 – Five Billion Eighty-Five Million Eight Hundred Ninety-One Thousand Two Hundred Fifty Turkish Lira), and the share transfer was completed as of September 3, 2026, following the completion of the payments. The aforementioned share transfer was registered on September 8, 2026 and announced in the Turkish Trade Registry Gazette dated September 8, 2026 and numbered 11661. Under the relevant agreement, three license areas located in Denizli Sarayköy, Denizli Buldan and Manisa Alaşehir will also be transferred. The geothermal power plant subject to the transaction, located in the Germencik district of Aydın province and having a total installed capacity of 24.00 MWm, commenced operations in November 2024. The electricity generated at the plant is subject to a state purchase guarantee for 15 years under Law No. 5346 on the Utilization of Renewable Energy Resources for the Purpose of Generating Electrical Energy (YEKDEM). Accordingly, the electricity will be sold at approximately USD 12.50 cents/kWh, including the domestic component contribution, for the first five years and at approximately USD 10.50 cents/kWh for the remaining ten years. Annual gross electricity generation of approximately 200,569,000 kWh is expected from the relevant power plant. Excluding potential additional revenues and based solely on electricity generation, annual sales revenue of approximately USD 16,446,655 (TRY 792,852,121), including the domestic component contribution, and EBITDA of approximately USD 13,462,073 (TRY 648,972,884) are projected for the first five years. Following the expiration of the initial five-year period, annual sales revenue of approximately USD 14,802,000 (TRY 713,567,415) and EBITDA of approximately USD 11,724,000 (TRY 565,184,730), based solely on electricity generation from the relevant power plants, are expected. Throughout the YEKDEM period, excluding potential additional revenues and based solely on electricity generation, total sales revenue of approximately USD 215,451,275 (TRY 10,386,367,340) and EBITDA of approximately USD 172,826,365 (TRY 8,331,526,991) are projected. Following the acquisition in 2025 of a geothermal power plant with an installed capacity of 12 MWm, our Company increased its total installed capacity to 130.03 MWm. With the acquisition of the HEZ MORALI JES-1 power generation plant, which has an installed capacity of 24 MWm, our Company's total installed capacity has reached 154.03 MWm. In addition, together with our subsidiaries that own a total of 200.04 MWm of electricity generation capacity comprising four hydroelectric, five wind, one geothermal and three solar power plants, our total installed capacity has reached 354.07 MWm. The necessary technical studies regarding the geothermal operating license area covering 9,054.92 hectares in Aydın Söke-Germencik, where the relevant power plant is located and currently operating, were submitted to our Company on June 8, 2026. Taking into consideration the capacity increases envisaged within the scope of the expansion investments of the existing operating power plant, a 100 MWe-capacity switchyard and substation had previously been constructed and commissioned. Accordingly, the infrastructure required for grid connection following the construction of an additional 72 MWm geothermal power plant is already in place, and the relevant investments are planned to be carried out in the upcoming period. Upon completion of the said additional investment, it is planned that a geothermal power plant with a total installed capacity of 96 MWm will be operational as a result of new investments to be made within the relevant geothermal operating license area. Upon completion of the relevant investments, the electricity generated by geothermal power plants with a total installed capacity of 96 MWm will be subject to a state purchase guarantee for 15 years under Law No. 5346 on the Utilization of Renewable Energy Resources for the Purpose of Generating Electrical Energy (YEKDEM), with electricity sales at approximately USD 12.50 cents/kWh, including the domestic component contribution, for the first five years and approximately USD 10.50 cents/kWh for the following ten years. Annual gross electricity generation of approximately 802,276,000 kWh is expected from these power plants. Excluding potential additional revenues and based solely on electricity generation, annual sales revenue of approximately USD 65,786,620, including the domestic component contribution, and EBITDA of approximately USD 53,848,292 are projected for the first five years. It had been announced that the transfer of three geothermal license areas (Denizli Sarayköy, Denizli Buldan and Manisa Alaşehir), whose acquisition process was ongoing under the Share Transfer Agreement signed on March 18, 2026, would also be completed. The necessary technical studies regarding the geothermal license areas to be transferred under the relevant agreement were submitted to our Company on June 8, 2026, and the construction of geothermal power plants with a total capacity of 144 MWm is planned based on these technical studies. The electricity generated by the geothermal power plants with a total installed capacity of 144 MWm will be subject to a state purchase guarantee for 15 years under Law No. 5346 on the Utilization of Renewable Energy Resources for the Purpose of Generating Electrical Energy (YEKDEM), with electricity sales at approximately USD 12.50 cents/kWh, including the domestic component contribution, for the first five years and approximately USD 10.50 cents/kWh for the following ten years. Annual gross electricity generation of approximately 1,203,414,000 kWh is expected from these power plants. Excluding potential additional revenues and based solely on electricity generation, annual sales revenue of approximately USD 98,679,930, including the domestic component contribution, and EBITDA of approximately USD 80,772,438 are projected for the first five years. As announced in our Company's Public Disclosure Platform ("KAP") disclosure dated June 8, 2026, in line with our objective of increasing investments in the renewable energy sector, an agreement had been signed for the acquisition of nine Geothermal Resource Licenses located in Denizli and Manisa provinces, with a total potential installed capacity of 505 MWm, and the transfers were completed on April 22, 2026. Within the scope of drilling activities for production and injection wells at different depths in the license areas, a drilling rig services agreement has been signed with a company resident in Türkiye for the provision of drilling rigs and personnel of varying capacities, as well as related services and consumable materials, for a total of 10 wells, consisting of 5 firm and 5 optional wells. In this context, investments in geothermal projects have commenced, and drilling activities have started under the supervision of the employer's engineering and inspection company pursuant to the Geothermal Drilling Project Management and Well Engineering Services Agreement and the Drilling Services Agreement, as announced on July 20, 2026. Upon completion of the investments, electricity sales are expected to be carried out under a state purchase guarantee for a total period of 15 years pursuant to Law No. 5346 on Renewable Energy Resources, at an average price of USD 12.50 cents/kWh, including the domestic component contribution, for five years from the acceptance date and at an average price of USD 10.50 cents/kWh in the following years. Annual gross electricity generation of approximately 3,863,250,000 kWh is expected from the geothermal power plants. Excluding potential additional revenues and based solely on electricity generation, annual sales revenue of approximately USD 462,850,000, including the domestic component contribution, and EBITDA of approximately USD 370,250,000 are projected for the first five years. Following the expiration of the initial five-year period, annual sales revenue of approximately USD 405,000,000 and EBITDA of approximately USD 324,000,000, based solely on electricity generation from the relevant power plants, are expected. Following the completion of the transfer of the HEZ MORALI JES-1 power plant and the relevant license areas, the geothermal power generation capacity, including the existing 24 MWm power plant and the geothermal power plants planned to be developed, is expected to reach a total potential installed capacity of 745 MWm, comprising 72 MWm, 144 MWm and 505 MWm of planned geothermal power plant capacity. Upon completion of the geothermal energy investments with a total installed capacity of 745 MWm, annual gross electricity generation of approximately 5,868,940,000 kWh is expected. Excluding potential additional revenues and based solely on electricity sales, annual sales revenue of approximately USD 627,316,550 and EBITDA of USD 504,870,730 are projected for the first five years, while annual sales revenue of approximately USD 553,020,000 and EBITDA of USD 441,240,000 are expected in the subsequent period. Respectfully announced to the public and our investors. Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.
Kaynak: KAP
Öne Çıkan Alanlar
Şirketten Son 30 Günde İlgili Bildirimler
Aynı Tür Bildirim Geçmişi
Finansal Duran Varlık Edinimi
Jeotermal Enerji Yatırımları ve Proje Şirketi Kuruluşu Hakkında
Kaynak: Kamuyu Aydınlatma Platformu (KAP). · Yatırım tavsiyesi değildir.